Additional Projects Performed by J Harper Contractors
Boeing Building 17-11 & 17-74
The Boeing Company
Contact Person: Lee Lei, Project Manager 206-304-8415
Contract Amount: $369,193.75 Complete ~ 12/2008
Scope of Work: Complete demolition of three Boeing buildings in Auburn, WA. Removal of the 17-11 & 17-
74 and 17-36 buildings. Demolition included complete removal of the three buildings and their foundations.
Import soil and hydroseed after the demolition is complete. This project was on a tight time constraint and
was met within the time limits.
Sabey Metal Shop
Sabey Construction
Contact Person: Project Manager
Contract Amount: $ Complete~ May 2009
Scope of Work
Avalon Towers Bellevue
Avalon Bay Communities
Contact Person: , Project Manager
Contract Amount: $ 26,414.00 Completed ~ 9/2008
Dry Docks
Pacific Pile Marine
Contact Person: Greg Andreas, Project Manger
Contract Amount: $477,060.00 Completed: ~ 12/08
Scope of Work: To remove under water dry docks located in Lake Washington.
Ballard Bridge aka BB2
Sound Environmental
Contact Person: Corey League, Project Manager 206-436-5919
Contract Amount: $177,000.00 Completed ~ In Progress
Scope of Work: Complete demolition of two above grade structures, excluding asphalt paving and concrete
slabs. Haul off site all salvage and debris. 75% of the demolition debris must be recycled or reused.
Preserve all existing on and off property groundwater monitoring wells.
Glacier High School
State of Washington
Contact Person: Larry Covey, Project Manger 360-902-7272
Contract Amount: $56,581.00 Completed ~ 08/2008
Scope of Work: Demolition and removal of the Glacier High school for Highline School District # 401.
House on Jones Road
Long Services
Contact Person: Eric Evans, Project Manger 253-234-8050
Contract Amount: $18,900.00 Completed ~ 07/2008
Scope of Work: The Demolition and removal of a fire damaged house in Renton, WA. Demolition will also
include the garage. Slab on grade will also be demolished and removed. Removal of one pile of ruble left
on site.
Starfire Sports Complex
Terra Dynamics
Contact Person:
Contract Amount: $56,540.00 Completed ~ 08/2008
Scope of Work: Demolition and removal of the sporting events shed. Removal of concrete slabs. Removal
of fences and of light poles.
South Hill Business and Technology Center
JTM Construction
Contact Person: Mike Thibeau, Project Manager
Contract Amount: $109,750.00 Completed ~ 07/2008
Scope of Work: Perform all building and plaza demolition for the South Hill Business and Technology Center
project. CMU walls, GWB walls finishes, doors and hardware, superstructure, footings and slabs.
Yale Ave. Project
Howard S. Wright Construction Co.
Contact Person: Paul Cronin, Project Manager 425-478-8900
Contract Amount: $147,000.00 Completed ~ In Progress
Scope of Work” Demolition of structures with the north residence. removal of the elevated slab section and
leave remaining portions of the foundation and slab on grade on N & S elevations along with entire east
elevation.
Lake Sammamish House
Jeff Clark
Contact Person: Jeff Clark, Owner
Contract Amount: $54,450.00 Completed ~ 08/2008
Scope of Work: Demolition of 3 story house and smaller lake house. Demolition of slabs, foundations,
sidewalks and retaining walls. Lower portion of driveway and half of the tennis court. Cutting and capping
of utilities.
Lincoln Ave Grade Separation
Gary Merlino
Contact Person: Rhull Reedy Project Manger 206-762-9125
Contract Amount: $ 196,000.00 Completed ~ In Progress
Scope of Work: Demolition of the scale pit and adjacent attached loading docks. This will also include the
concrete aprons and sidewalks. Asbestos abatement will also be performed to remove the PCB ballast,
light tubes and HID per Hazardous Material. Demolition of the structures is limited to the building footprint.
SR522 Corridor Improvements Phase 1
MidMountain Contractors
Contact Person: Gary Jenson. Project Manger 425-202-3647
Contract Amount: $ 23,538.00 Completed: ~ In Progress
Scope of work: Demolition of the Napa Auto store to include slab and existing foundations. Removal all
debris. All depressions and excavations created during demolition shall be filled and rough graded using
on site materials.
Microsoft Wall
Sabey Construction
Contact Person: Marcelo Garess, Project Manger 206-281-4200
Contract Amount: $ 23,450.00 Completed ~ 04/2008
Scope of Work: Demolition and removal of the wall on Building 4 in South Seattle. Demolition will included
saw-cutting of the wall at approximately 3’ above grade. Protection of the asphalt paving. Vacuuming and
disposal of concrete slurry.
Coal Creek Parkway-Phase 3
C.A. Carey
Contact Person: Chris Carey, Project Manager 425-392-8016
Contract Amount: $61,500.00 Completed ~ 08/2008
Scope of Work: Demolition of a Bridge Super Structure, Footings and Abutments. Trucking and disposal of
all concrete from the bridge.
2nd Floor Building / Interior Demolition
The Boeing Company
Contact Person: Mike Prittie, Project Manager 206-655-2121
Contract Amount: $43,908.58. Completed ~ 01/2008
Scope of Work: Demolition of the interior structure of the Boeing building 7-244. Stripping of the 2nd floor
tenant improvement space was also provided.
C759 Southcenter Blvd Improvements
SCI Infrastructure
Contact Person: Mark Scoccolo, Project Manager 253-218-0444
Contract Amount: $ 200,000.00 Completed ~ 05/2008
Scope of Work: Demolition and removal of structures, slabs and foundations limited to the building foot
prints. Removal of asbestos, light tubes, ballast and mercury thermostats per Med-Tox survey.
Stock House
Sabey Construction
Contact Person: Glenn Parry, Project Manager 206-730-4983
Contract Amount: $ 1,330,503.70 Completed ~ In progress
Scope of work: Complete demolition of the old Rainer Ice House. Salvage and are locate all salvageable
exterior Wythe brick to Owners warehouse. Salvage and store on site brick for neighborhood pick-up.
Salvage and relocate all masonry signage and the street level sandstone. Salvage and relocate wood from
Stock House. Any CMU ad brick not salvaged to taken and crushed with our crusher. Concrete buttress
footings and associated steel to be removes. Demolition of Café’ Umbria with complete removal of the slab
and footings.
Clay Lacy Hanger Improvement
JTM Construction
Contact Person: Mike Thibeau, Project Manager
Contract Amount: $109,500.00 Completed ~ 01/2008
Scope of Work: Demolition of two buildings and including pavement. Demolition of hanger superstructure
and hanger slabs, foundations. Necessary saw cutting. Crushing and leaving all concrete and asphalt on
site.
Adams Oregon, “Tank Removal”
Clearcreek Contractors, J
Contact Person: Jay Wilcox, Project Manager 206-423-1851
Contract Amount: $78,500.00 Completed ~ 10/2007
Scope of Work: Demolition and removal of 7 fuel tanks. 2,500lf of 4’ above grade pipe and 500lf of 4’ below
grade. 19,500sf of AC at 4” and 5,500sf of concrete at 6”. Demolition and removal of the loading station,
pipe header and the foundation of the loading station and CMU wall.
635 Elliott Avenue “Darigold Building”
Lease Crutcher Lewis
Contact Person: Joe Neuenschwander, Project Manager 206-689-0428
Contract Amount: $577,520.00 Completed ~ 04/2008
Scope of Work: The demolition and removal of the old DARIGOLD building. Upon completion, import and
place 1300cy of 4” minus crushed concrete.
Boeing Line 3 Horizontal Wing Line
Skanska USA
Contact Person: Sam Holden, Project Manager 206-713-1867
Contract Amount: $ 283,811.00 Completed ~ 10/2007
Scope of Work: The demolition and removal of a concrete slab. Multiple thickness of the concrete slab
ranging from 12” or less thick to 19”-24” thick. Additional concrete saw cutting required again ranging in
thickness form 12” or less thick to 19”-24” thick. All concrete is to be removed of the project job site.
Bellevue Hyatt Expansion
Northwest Construction
Contact Person: Jeff Nelson, Project Manager 425-453-8380
Contract Amount $15,900.00 Completed ~ 09/2007
Scope of Work: Demolition and removal of a roadway slab 12’ x 215’ x 6. Saw Cutting was also required for
this project.
Tacoma General Boiler
JTM Construction
Contact Person: Corey Anderson, Project Manger 206-714-4716
Contract Amount: $ 34,195.74 Completed ~ 12/2007
Scope of Work: Demolition of a two story office building, including slabs, basement wall and foundations.
Demolition was also to include removal of side walks associated with the office building, all rockeries
adjacent to off building. All concrete & CMU associated with the tank enclosure.
Well House Treatment Facility
MidMountain Contractors
Contact Person: Brian Fortin, Project Manager 206-354-2317
Contract Amount: $ 24,523.15 Completed ~ 08/2007
Scope of Work: Demolition and removal of the structure. Demolition and removal of all slabs, foundations
and thickened slabs. Saw Cutting at the well, was also required. Removal of all debris and concrete off the
project site.
Tacoma Community College
Centennial Contractors Enterprises
Contact Person: Lee Seyler, Project Manager 253-344-6632
Contract Amount: $72,809.30 Completed ~ 01/2008
Scope of Work: Demolition and removal of multiple buildings on a school campus. Cap off water and mark
location at all of the buildings. Cut off sewer and mark locations at all of the buildings. Import topsoil, level
and hydroseed site of demolished buildings.
Haborview Concrete Removal
Mid Mountain Contractors
Contact Person: Mark O’Leary, Project Manager 425-202-3600
Contract Amount: $ 7,800.00 Completed ~ 08/2007
Scope of Work: Demo and remove 4 slabs of concrete. All concrete to be removed and hauled away. Work
is to be done over a weekend time frame.
Commuter Rail Station
Gary Merlino Construction
Contact Person: Brandon Ainsworth, Project Manager 206-793-1161
Contract Amount: $30,700.00 Completed ~ 04/2008
Scope of Work: Demolition of existing house including the basement walls, slab and foundations.
Demolition will also include a shed located on the property. Removal of up to 3 each – 100cy loads of
debris from previously demolished structures.
Muckleshoot Casino
MidMountain Contractors
Contact Person: Mark O’Leary, Project Manager 425-202-3600
Contract Amount: $ 70,688.00 Completed ~ 08/2007
Scope of Work: The demolition of the existing Bingo Hall. Demolition and removal of the building structure.
Demolition of air conditioning units located on the ground out the hall. All debris and concrete to be
removed and all scrap to be recycled.
Bartell Drug Store
Rushforth Construction
Contact Person: Sefton Oxford, Project Manager 206-292-9165
Contract Amount: $70,524.00 Completed ~ 09/2007
Scope of Work: Demolition of the super structure. Entire metal rood system to e recycled and sold as
scrap. Demolition of the entry sidewalk and rear concrete pad. Demolition of large existing transformer
vault. Removal of refrigerant CFC, PCB’s, and Light Tubes an Asbestos/ Sewer and Water to be capped at
the foundation.
Coupeville High School
Walker Specialty
Contact Person: Joe Baker, Project Manager 206-361-8913
Contract Amount: $ 194,750.00 Completed ~ 07/2007
Scope of Work: Demolition and removal of 2 two-story buildings of the Coupeville High School. Load and
haul contaminated soil to an approved debris site.
Tacoma Plant Steel Structures
Busby Marine and Tank
Contact Person: Jan Young, Project Manager 253-255-8102
Contract Amount: $ 4,500.00 Completed ~ 06/2007
Scope of Work. Complete demolition of the structures and removal of all the scrap material off site.
2007 AIP Contract
Gary Merlino
Contact Person: Zach Gaul, Project Manager 206-762-9125
Contract Amount: $57,500.00 Completed ~ 05/2007
Scope of Work: Demolition of two structures to also include the CMU wall. Slabs and foundations also
removed to grade.
T-5 SE Travel & Upland
Port of Seattle
Contact Person: Tina Hemingway, Project Manger 206-728-3587
Contract Amount: $ 18,750.00 Completed ~ 05/2007
Scope of Work: Remove and dispose of the existing travel lift and uplands pilings. Cut off 2 each timber
piles at grade. Cut of 2 each timber piles 3” Feet above grade. Remove monorail & Steel chance supports.
AMC Theater
City of Federal Way
Contact Person: Lillian Yeh, Project Manager 253-835-2501
Contract Amount: $ 89,640.00 Completed ~ 06/2007
Scope of Work: Demolition and removal and land clearing of a former movie theater.
Stock Pot Building
Hoffman Construction
Contact Person: Dave Johnson, Project Manager 425-984-6340
Contract Amount: $36,000.00 Completed ~ 07/2007
Scope of Work: Interior demolition and removal of the mastics and / or adhesives from the walls, floors,
ceilings. Ceilings are to remain.
Munizza
RV & Associates
Contact Person: Rob Lumsden, Project Manager 360-876-9737
Contract Amount $38,500.00 Completed ~ 04/2007
Scope of Work: Demolition of an Auto Parts Store and the adjacent AC paving. Wrecking and removing
Auto Parts store, adjacent AC paving, greenhouse concrete. Load and haul miscellaneous site debris.
Walgreen’s
Pennon Construction
Contact Person: Daniel Bowers, Project Manager 206-418-0235
Contract Amount: $69,000.00 Completed ~ 04/2007
Scope of Work: Demolition of structures and associated slabs and foundations. Demolition of
miscellaneous concrete slabs. Removal of AC up to 3’ thick to fence the boundaries of the site.
Boeing 2-64 Building
The Boeing Company
Contact Person: Mike Prittie, Project Manager 206-655-2121
Contract Amount: $232,993.00 Completed ~ 06/2007
Scope of Work: Demolition of a Boeing building, foundations removal, pavement removal, Underground pit
removal, transformer yard demolition, cooling tower demolition and complete backfilling of site when
complete.
Gateway Center Medical Office Building
Howard S. Wright
Contact Person: Chris Kreifels, Project Manager 206-447-7686
Contract Amount: $25,836.00 Completed: 05/2007
Scope of Work: Demolition and removal of a superstructure with the accompanying slabs, foundations and
footings. Demolition and removal of abandoned footings and foundation walls form previous building.
Capping of sanitary sewer at building footprint.
River Park Parking Garage
Howard S. Wright
Contact Person: Jason Solis, Project Manager 206-447-7686
Contract Amount: $173,000.00 Completed ~ 07/2007
Scope of Work: Demolition of structures including foundations and slabs, sidewalks. Crushing of concrete
to common borrow specs, left and stockpiled on site for use by others.
Equinox
PCL Construction
Contact Person: Aaron Wiehe, Project Manager 425-454-8020
Contract Amount: $164,000.00 Completed ~ 04/2007
Scope of Work: Removal and disposal of asbestos and the demolition and removal of structures,
landscaping and select utilities on site.
Wards Cove Packing Building
GLY Construction
Contact Person: Lee Noble, Project Manger 425-765-0812
Contract Amount $140,943.00 Completed ~ 08/2007
Scope of Work: Removal of two cranes at the Wards Cove Packing Company. Demolition of the structures
and pavements.
Echo Lake Senior / Market Rate Apartments
Inland Washington, LLC
Contact Person: Todd Walton, Project Manager 509-321-3210
Contract Amount: 45,000.00 Completed ~ 02/2007
Scope of Work: The demolition and hazardous material abatement. Demolish four existing structures
including the surrounding asphalt and concrete. Tank removal at the Exxon service station.
High Point Redevelopment Phase II
Tri-State Construction
Contact Person; Paul Clements, Project Manager 425-455-2570
Contract Amount: 1,348,136.00 Completed ~ 10/2007
Scope of Work: Demolition of 127 structures including concrete foundations, basements and adjacent
sidewalks and steps. Lead soil removal and disposal at perimeter of structures
Fircrest School
State of Washington
Contract Person: Ed Valbert, Project Manager 360-902-7572
Contract Amount $ 419,718.00 Completed ~ 05/2007
Scope of Work: Superintendent at the Fircrest School Demolition. Demolition of the Fircrest School. Bury
broken concrete with pea gravel on site within the basement spaces then compacted site in Shoreline, WA
for State of Washington and DSHS
Boeing 10-100
Boeing
Contact Person: Robert (Bob) Larson, 206-491-9283
Contract Amount: $170,467.93 Completed ~ 07/2006
Scope of Work: Building Demolition. Security watch
Highline Boulevard School
BELFOR
Contact Person: Brian Jones, Project Manager 206-632-0800
Contract Amount: $57,884.85 Complete ~ 07/2006
Scope of Work: Demolition of remaining school that was burnt down. Removal of all asbestos material to
landfill.
SeaTac Airport Improvements
Gary Merlino
Contact Person: Doug Williams, Project Manager 206-433-7355
Contract Amount: $ 158,000.00 Completed ~ 10/2006
Scope of Work: Demolition of structures and site improvement including saw cutting of exterior title-up
walls. Fence removal, light pole removal and landscape removal. Storm drain socks.
SeaTac Engineering Modular Office
Clements
Contact Person: Larry Clements, Owner / Project Manager 253-631-8106
Contract Amount: $180,754.00 Completed ~ 08/2006
Scope of Work: Demolition of Host Kitchen Building and Equipment Storage Building. Cut to Grade, Load
and Dispose of Approximately 4000 cy of dirt haul off.
Demolition of Rite Aid
Pennon Construction
Contact Person: Daniel Bowers, Project Manager 206-255-1398
Contract Amount: $ 75,488.00 Completed ~ 04/2006
Scope of Work: Demolition of superstructures, foundation, slab and sit paving and vegetation. Removal of
disposal of asbestos materials with air monitoring during demolition of non-friable roofing material over
office the building. Removal and disposal of 400 fluorescent light tubes. Removal of sign signage and light
standards. Clearing and grubbing.
333 Elliot
Lease Crutcher Lewis
Contact Person: Tom Holzer, Project Manger 206-622-0500
Contract Amount: $57,750.00 Completed ~ 05/2006
Scope of Work: Demolition of building, slabs basement wall and foundations. Capping sewers within 5 feet
of the building foot print
N.W. Container
Rushforth Construction
Contact Person: Rick Hansen, Project Manger (253) 377-7551
Contract Amount: $310,640.00 Completed ~ 2006
Scope of Work: Demolition of multiple superstructures, slabs, footings and foundations to below two feet
below existing grade. Cut and cap utilities adjacent to buildings footprint. Backfilling basement
Tristate Trucking
Tri-State
Contact Person: Kim Agostino, Contract Administrator 206-632-7717
Contract Amount: Rental Fee Completed ~ 01/2007
Scope of Work: Provide hauling needs for 3rd Runway 2006 Embankment Project for the Port of Seattle.
Public Storage – MLK Way
Public Storage subcontractor to Sierra Construction
Contract Person: Chip McCullough, Project Manager (425) 487-5200
Contract Amount: $58,695.00 Completed ~ 2006
Scope of Work: Demolition and removal of superstructure, accompanying foundations and assumed 4”
slabs. Removal all debris and concrete. Capping of sewer service within 3’ of each building.
City of Tacoma Central Treatment Plant
MWH
Contact Person: Ray Lang, Project Manager
Contract Amount: $129,132.00 Completed ~ 08/2008
Scope of Work: demolition and removal of floating lids of Old Digester No.1 & 2. Removal of Job Crane and
Chlorine Cylinder Rack. Gut and clear our contents of 2 chlorine rooms. Removal of 1 protected water
storage tanks and associated piping. Demolition of screening facility and concrete apron at eh TAGRO pit.
Hwy 167 for ICON
ICON
Contact Person: David Basinger, Project Manager 206-574-3920
Contract Amount: $61,480.00 Completed ~0 8/2006
Scope of Work: Demolition of structures in the wetland area. CDL Debris Removal, concrete demolition and
removal.
2006 Third Runway – Towers
TTI Constructors
Contact Person: Shawn Marvin, Project Manager 206-988-5051
Contract Amount: $55,000.00 Completed ~ 04/2006
Scope of Work: Demolition of underground utilities and duct banks. Demolition of foundations of ALSF
Towers and ASDE Facility. Haul and dispose all debris and recycled scrap.
Microsoft Building 99
Microsoft subcontractor to GLY
Contact Person: Nancy Kitano, Project Manager (425-451-8877)
Contract Value: $414,464.17 Completed ~ 2006
Scope of Work: Demolition and removal of two building structures in their entirety. Also included were
foundations, below grade, loading docks, building superstructure, retaining walls. Included is the removal of
salvage, recycling and disposal of debris. Capping storm, sewer and water lines.
Avalon Bay on the Square
Avalon Bay Communities, Inc.
Contact Person: Bridget Miller, Project Manager (425) 576-2116
Contract Amount: $342,618.00 Completed ~ 2006
Scope of Work: Demolition of structures and sidewalks connected to the structures. Demolition of Nordic
Track sign and foundation, Mercedes specialist fuel island foundation, slab and canopy. Cutting and
capping sewers and building line
Ravensadale Hauling
Obayashi Corporation
Contact Person: Jon Kirk, Project Manager
Contract Amount: Rental Fee Completed ~ 11/2005
Scope of Work: Provided truck rental to provide hauling needs to Obayashi
Boeing Bldg 4-20 Line 6 Office Complex
Boeing
Contact Person: Edward P. Oehlschlaeger-Browne, Project Manager
Contract Amount: $25,000.00 Completed ~ 10/2005
Scope of Work: removal of the office tower. Scrap material at a licensed facility. Remove all debris from the
site
Demolition and Removal of Old Country Buffet
Pennon Construction
Contact Person: Bob Keatley 206-418-0235
Contract Value: $28,500.00 Completed ~ 2005
Scope of Work: Structural demolition specially includes all buildings and plaza patio. Building slab and
foundation stripped clean. Removal of all debris
Demolition and Removal Portland Lumbar Yard
Pennon Construction
Contact Person: Bob Keatley 206-418-0235
Contract Value: $50,870.00 Completed ~ 2005
Scope of Work: Structural demolition specifically includes all buildings, foundations, slabs and asphalt
paving. Removal of all debris.
Sound Transit Bus Link Light Rail
Nuprecon
Contact Person: Dan Johnson, Project Manager 425-881-0623
Contract Amount: Rental Fee Completed ~ 06/2006
Scope of Work: Provided hauling needs for the C510 Downtown Seattle Bus Tunnel Retrofit and Expansion
project. Hauling concrete and other demolition debris from the project.
Demolition and Removal Highline School District
Washington State
Contact Person: Dan Moore 360-902-0434
Contract Value: $235,648.00 Completed ~ 03/2006
Scope of Work: Demolish and remove multiple structures. Dispose of non hazardous materials. Removal of
foundations, slab footing, walkways, rough grading.
Demolition and Removal of Brightwater North Creek Portal Business Office
King County
Contact Person: William Sroufe 206-296-1405
Contract Value: $164,299.00 Completed ~ 12/2005
Scope of Work: Demolition of existing two story office building. Remove all material off-site. Disconnect and
cap utilities.
Deconstruction / Demo of Structures at the Brightwater Site
King County
Contact Person: William Sroufe 206-296-1405
Contract Value: $182,744.00 Completed ~ 05/2006
Scope of Work: Deconstruct / demolish and remove approximately 50 structures. Removal of all debris and
rubbish including pre-existing debris. Disconnect, cap and flag all utilities for structures.
Demolition and Removal of the Tyee Bowling Alley Building
Everett Community College and subcontractor to MA Mortenson
Contract Person: Jennifer Kim, Project Manager (425) 259-6727
Contract Value: $89,273.00 Completed~ 11/2005
Scope of Work: Asbestos removal and disposal; cap sewer service within 5 feet of the building footprint;
demolition and removal of bowling alley including slabs and footings.
Commuter Rail Station, IFB No. RTA/CP 59-05, Everett, WA
Sound Transit and subcontractor to Clearcreek Contractors, Inc.
Contact Person: Mark McCullough, President (425) 252-5800
Contract Value: $99,000.00 Completed ~ 11/2005
Scope of Work: Asbestos removal and disposal; removal and disposal of tank farm tanks, foundation, and
containment wall; demolition and removal of structures, slabs, foundations, and equipment.
Boeing Building. 7-81-5 Telephone Switch Room Demolition
Project CNT-R-04013
The Boeing Company Contact person: Bill Price (425) 237-4519
Contract Value: $22,516.00 Completed ~ 2005
Scope of Work: Demolition and removal of existing telephone switch
room back to warehouse use; drain, isolate, cap, and remove sprinkler
lines; and cap roof ducts.
Central Light Rail Link C755 at South Boeing Access Road to South 154th
Sound Transit and subcontractor to PCL Construction Services, Inc.
Contact Person: Pat Malon (206)529-5341
Contract Value: $157, 000, 00 Completed ~ 03/2008
Scope of Work: Removal and disposal of asbestos containing material;
Demolition and removal of 16 existing structures and buildings;
Disconnect/abandonment of water and sewer services.
WSDOT C/N 6895 1-182 to Columbia Center I/C FA IMD-0240(012)
Washington State Dept. Of Transportation subcontractor to ICON Materials.
Contact person: Bruce Harjausen (206) 574-3915
Contract Value: $423,250.00 Completed ~ 12/2006
Scope of Work: Asbestos removal and disposal; demolition and removal of buildings, slabs footings, and
foundations; demolition and removal of 1-240 bridge over Columbia Park Trail.
WSDOT Ben's Auto Repair Demolition
Contact person: Phet Sinthavong (360) 705-7858
Contract Value: $32,927.00 Completed ~ 06/2005
Scope of Work: Demolition and removal of the former Ben's Auto Repair Building.
Othello Corner Lot Abatement and Demolition
Seattle Housing Authority
Contact person: Tracey Locke, Project Manager (206) 615-3480
Contract Value: $99,735.00 Completed ~10/2005
Scope of Work: Asbestos removal and disposal; demolition and
removal of 8 structures; removal and disposal of concrete footings,
foundations, basements, and slabs; landscape and tree removal; and site
grading and stabilization.
Beacon Hill Sound Transit C710
Obayashi Corporation
Contact Person: Masaki Omote, Project Manger 26-262-0665
Contract Value: $1,563,825.24 Completed ~ 05/2005
Scope of Work: Demolition of multi structures, DSHS building, family dentist building, Arco gas station,
Speedee Lube and removal of all slabs. Asbestos Removal from DSHS building. Broke and crushed
concrete for hauling. Dug and loaded contained soil for hauling. Removed debris and brush for despoil.
Third Runway Project
Port of Seattle & Subcontractor to TTI Constructors.
Contact Person: Shawn Marvin 206-988-5051
Contract Value: $2,181,425.00 Completed ~ 11/2005
Scope of Work: Utility Demolition and Embankment Transportation
RTA/LR-99-02 C735 Central Link Light Rail-Rainier Valley
Sound Transit subcontractor to RCI/Herzog.
Contact Person: Deron Haptonstall, Project Manager (206) 315-2968
Contract Value: $1,102,697.34 Completed ~ 10/2007
Scope of Work: Demolition and removal of 50 plus houses and structures;
Removal and disposal of misc. debris; process concrete down to three foot
Minus; cut and cap water and sewer.